EST-TUN 13x23 shot blast tunnel and blast room for Pla, John Deere

Back to News

Agricultural sprayers

Structures ready for painting, with explosion-protected dust collectors

Pla, the John Deere brand that builds sprayers and agricultural machinery components in Las Rosas, Santa Fe, Argentina, blasts its structures with two CYM machines: an EST-TUN 13x23 shot blast tunnel with 12 blast wheels for series production, and a blast room for large parts and touch-ups. Both are part of the plant's new line, opened in April 2024, and work integrated with the paint line and the power and free conveyor.

The challenge

Before painting, the frames, booms and welded structures of a sprayer must be clean and have the anchor profile the coating needs. They are long, heavy parts with complex shapes that travel through the plant hanging from the conveyor.

Three more conditions applied:

• Line pace. Blasting had to keep up with the power and free conveyor feeding the paint line, without unhooking the parts.
• Oversized parts. Some structures exceed the section of a tunnel, and others need manual touch-ups.

• Safety. John Deere requires explosion protection on dust collection at all its plants worldwide.

The solution

1. EST-TUN 13x23 tunnel with twelve 10 HP blast wheels. Parts pass through the cabinet hanging from the conveyor, on hangers up to 9 m (30 ft) long and 2 t (4,400 lb), at 0.3 to 1 m/min (1 to 3.3 ft/min). The 12 blast wheels, angled 35° to the travel direction, throw a total of 1,200 kg (2,650 lb) of shot per minute from different angles, reaching every face of the structure with no blind spots. At the exit, in the blow-off area, the operator removes the shot left on the parts.

PASSAGE SECTION1.3 M WIDE × 2.3 M HIGH (51 × 91 IN)
HANGER LENGTHUP TO 9 M (30 FT)
LOADUP TO 2 T (4,400 LB) PER HANGER
SPEED0,3 A 1 M/MIN
BLAST WHEELS12 × TR 360, 10 HP EACH, ANGLED 35°
ABRASIVESTEEL SHOT S330/S390
REVESTIMIENTOMANGANESE STEEL, WITH CAST HIGH-CHROME PLATES ≥64 HRC IN IMPACT ZONES
CONTROLSIEMENS S7-1200 PLC, HMI AND ONE AMMETER PER BLAST WHEEL
INTEGRATIONPAINT LINE AND POWER AND FREE CONVEYOR

2. Blast room, 5 × 3.62 × 12 m (16 × 12 × 39 ft). It takes parts up to 2.4 × 1.6 × 9.5 m and nearly 2 t, brought in hanging. The operator works with a blast pot that refills automatically from the silo, so there is no need to leave the room to load abrasive, and the remote control switches between blasting and blow-off on the same hose. Abrasive recovery is 100% automatic: oscillating scrapers cover the whole floor and carry the abrasive to the elevator and the separator. The room has sound-absorbing panels, 1,500 lux LED lighting mounted outside and positive-pressure protective equipment for the operator.

3. Two dust collectors with explosion protection. Each machine has its own Camfil Farr Gold Series collector, with explosion vents, an isolation valve on the inlet duct, fire sprinklers in the clean-air plenum, an abrasion-resistant inlet, a rotary valve for abrasive dust and pulse-jet cartridge cleaning. More on cartridge dust collectors.

The result

Both machines have been working at the Las Rosas plant since 2024. Structures leave the tunnel or the room and stay on the hook all the way to the paint line.

Can't find the equipment you need?

Can't find the equipment you need?

CYM Materiales develops it.

Our Engineering and Sales team works alongside the client to design a custom solution, reducing operating costs and maximizing productivity. Every project starts with a detailed technical assessment and ends with a machine built and tested at our plant

REQUEST A CUSTOM PROJECT